Skip to main content

v2.0

Major VersionM

by Quinn Colville

  1. Save the job report
    • Save the job report

    • Open the valves to let oxygen back in and regulate the environment

  2. Raise the build plate up slowly Carefully brush powder into the canisters on the right side Repeat until the part is fully visible
    • Raise the build plate up slowly

    • Carefully brush powder into the canisters on the right side

    • Repeat until the part is fully visible

    • DO NOT OVERFILL POWDER CANISTERS

    • Transfer full canisters to PX Box and replace with empty ones if necessary

    • Read powder handling dozuki

    • Pick up build plate and base and gently shake loose powder into canisters

    • Place build plate in open SAS door

  3. You must be wearing:
    • You must be wearing:

    • Gloves

    • Jacket

    • Full PAPR

  4. Move build plate to table Use vacuum to remove any loose powder Pound build plate on tabletop to loosen powder in through holes and support material
    • Move build plate to table

    • Use vacuum to remove any loose powder

    • Pound build plate on tabletop to loosen powder in through holes and support material

    • Hold up vacuum to capture any powder

    • Part should be fully cleaned of residual powder

Finish Line

Quinn Colville

Member since: 12/16/2019

2,305 Reputation

12 Guides authored

Team

TW: Staff Member of TW: Staff

172 Members

279 Guides authored

0 Comments

Add Comment