Skip to main content
Help

23 Members

Additive Trainees Spring 2023

The Spring 2023 Additive Trainee Cohort

 

  • 1k

    Reputation

  • 0

    Solutions

  • 5

    Guides

Guides

Guide Image

Utilizing Jira for Lab Maintenance

Guide on using Jira for project management and to resupply consumables and...

Guide Image

Slicing and Software Operation

This guide will serve as a refrence for PreForm operation and proper slicing...

Guide Image

Grizzly Resurfacing Wheel

The plates that the ProX prints on are extremely precise. Taking your time...

Guide Image

Safely Disposing of Empty Resin Cartridges

This guide will outline the procedure of safely disposing of spent resin...

Guide Image

Cleaning the Build Chamber

The main cabinet of the ProX needs to be cleaned every 6 months.

Guide Image

Injection moulder Standard Operation Procedures

start up injection molder and run a mold.